The Walls Langtoft – House

The Walls at Langtoft continued in May 2017 with the demolishing of the existing house and starting the foundations of the new house.

20170510_073801

The construction of the shell of the house soon started after and by September 2017 it was at the stage ready for the roof to be started.

20170915_130624

This entry was posted in New Build. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *