The Walls Langtoft – House

The Walls at Langtoft continued in May 2017 with the demolishing of the existing house and starting the foundations of the new house.


The construction of the shell of the house soon started after and by September 2017 it was at the stage ready for the roof to be started.


This entry was posted in New Build. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>